The project will repair and alter the existing campus buildings systems and site systems bringing them into compliance with the Bet365 P100. Building items in need of repair include building envelopes (roofs, windows, exterior wall panels, storefront systems), elevators, mechanical systems, plumbing systems and fire alarm upgrades. Site items in need of repair include water service lines, the site septic system and the replacement of underground fuel oil tanks.
The Houlton IIJA LPOE design was awarded to Marvel on June 2, 2023. Marvel has completed two site surveys and has identified additional building issues to investigate. The project is a major repair and alteration of the main port building envelope and mechanical, electrical and life safety systems.
Final design concept submission review was completed on December 17, 2024. The next phases: Design Development, Construction Documents and Construction Administration modifications for the A/E and CMa to be awarded.
Environmental review
Not required — repair and alter the existing main port building only.
Award Phase 1: June 2023 Phase 2: End of June 2025 Completion: Spring 2028
Start date Early 2026
Award date Summer 2025
Substantial completion Spring 2028
SAM.gov
Next solicitation opportunity is expected Summer 2024.
Infrastructure Investment and Jobs Act
We received $3.4 billion to invest in our nation’s infrastructure and competitiveness. The law provides funding for LPOE modernization projects that will create new good-paying jobs, bolster safety and security, and make our economy more resilient to supply chain challenges.
Visit the Maine LPOE page for an overview of IIJA projects there, as well as priorities, benefits and further information.
Community impact
We will fully modernize the port with a new administration building, new pedestrian processing lanes, new primary building, new passenger vehicle lanes, and new commercial vehicle inspection area. The project will help improve traffic flow and border security while decreasing wait times for travelers.
PER DIEM LOOK-UP
1
Choose a location
Error, The Per Diem API is not responding. Please try again later.
No results could be found for the location you've entered.
Get my location
OR
OR
Rates for Alaska, Hawaii, and U.S. territories and possessions are set by the
Rates for foreign countries are set by the
2
Choose a date
OR
Rates are available between 10/1/2022 and 09/30/2025.
The End Date of your trip can not occur before the Start Date.
Traveler reimbursement is based on the location of the work activities and not the accommodations,
unless lodging is not available at the work activity, then the agency may authorize the rate where
lodging is obtained.
Unless otherwise specified, the per diem locality is defined as "all locations within, or entirely
surrounded by, the corporate limits of the key city, including independent entities located within
those boundaries."
Per diem localities with county definitions shall include"all locations within, or entirely
surrounded by, the corporate limits of the key city as well as the boundaries of the listed counties,
including independent entities located within the boundaries of the key city and the listed counties
(unless otherwise listed separately)."
When a military installation or Government - related facility(whether or not specifically named) is
located partially within more than one city or county boundary, the applicable per diem rate for the
entire installation or facility is the higher of the rates which apply to the cities and / or counties,
even though part(s) of such activities may be located outside the defined per diem locality.